Fifth seeded Robin Soderling beats Ernests Gulbis in three sets and eliminates him from the Rogers Open.

http://www.tennistalk.com/en/match_report/Rogers_Cup/2010/Ernests_Gulbis_-_Robin_S%C3%B6derling

Andris Biedrins rumored to be joining the Raptors

Andris Biedrins rumored to be joining the Raptors. Will Toronto be the new home for a second Latvian athlete?

http://www.torontosun.com/sports/basketball/2010/06/25/14510526.html

Rogers Cup August 7-15 Rexall Centre York University

http://www.rogerscup.com/men/english/tournamentSchedule.php

The Rogers Cup tennis tournament starts this coming Saturday, August 7. Latvia’s phenom, Ernests Gulbis, is slated to play.
Attached are the schedule and additional information.

Metrolinx Eglinton LRT

Metrolinx Eglinton LRT plan proceeding as planned and has already committed to spend $54 million to build four tunnel-boring machines to complete the first phase of the line. See attached for their latest release.

ECLRT_Underground Tunnel Soil Testing_eblast

Update – Summer 2010

The Eglinton Crosstown LRT line is a vital part of the Transit City plan as well as the Metrolinx plan for improved transit throughout the Greater Toronto and Hamilton Area in the coming years.

The Environmental Assessment of the Crosstown route was completed in March of 2010 and work now begins on the design phase of the tunnel and stations.

Phase One of the project to 2020 will run from Jane Street in the west to Kennedy Station in the east.

Phase Two of the project will run west from Jane Street to the Airport. This phase of the project will be funded through a future Metrolinx Investment Strategy.

Starting this summer engineers will begin work on the design of tunnel and stations that will serve the central part of Eglinton between Keele Street and Laird Avenue.

Current Work

Workers will be visible along Eglinton carrying out work such as:

·         utility location

·         geotechnical testing

·         soil analysis

Toronto residents travelling, working and living along Eglinton Avenue will notice preliminary temporary construction activity related to the TTC’s Eglinton Crosstown Light Rail Transit project from August through the winter. Please see the attached notice for info.

Eglinton Crosstown LRT

Transit City Department-TTC

(416) 397-8697

Eglintontransit@ttc.ca

Latviešu centrs Toronto meklē “Letts Shop” veikala vadītāju!

Latviešu centrs Toronto meklē “Letts Shop” veikala vadītāju, kam…:
• Jāprot sazināties gan latviešu, gan angļu valodās;
• Jāpārzina pieklājīgas sazināšanās pa telefonu un e-pastu.
• Jāspēj laipni apkalpot un vienmēr atrast kopēju valodu ar veikala Klientiem;
• Veikt ikmēneša inventarizāciju un informēt valdes locekļus par notiekošo veikalā;
• Jārūpejas par preču cenu politikas noteikšanu;
• Jālepojas ar darbu Latviešu centrā un jāprot interesanti pastāstīt par veikalā
nopērkamām precēm;
• Orientējas grāmatvedībā;
• Ir jābūt gatavam strādāt gan sestdienās, gan svētdienas;
• Jāprot atrast preces iepirkumiem no Latvijas un būt gatavam organizēt preces sūtīšanu
līdz veikala plauktam;
• Ar prieku organizēt preces plauktos un skatlogos tā, ka ne tikai pašam, bet arī citiem
patīk;
• Kam būs prieks veikalu gatavot Ziemassvētkiem, Lieldienām un citiem latviešu un
kanadiesu svētkiem.
Lūdzam interesantus nosūtīt CV un motivācijas vēstuli, kur aprakstīsi kā saredzi Letts
Shop veikalu, uz ēpastu: arnism@sympatico.ca

← Previous PageNext Page →